293414f482
For duplicate blocks prevention we want to verify that the last erasure batch was sufficiently propagated through turbine. This requires additional bookkeeping because, depending on the erasure coding schema, the entire batch might be recovered from only a few coding shreds. In order to simplify above, this commit instead ensures that the last erasure batch has >= 32 data shreds so that the batch cannot be recovered unless 32+ shreds are received from turbine or repair. |
||
---|---|---|
.. | ||
benches | ||
src | ||
Cargo.toml |