mirror of https://github.com/zcash/zips.git
Apply changes to status section
Co-authored-by: Daira Emma Hopwood <daira@jacaranda.org>
This commit is contained in:
parent
790c25aae2
commit
43398a862f
19
zip-0000.rst
19
zip-0000.rst
|
@ -583,13 +583,14 @@ ZIP Status Field
|
|||
|
||||
* Proposed: Typically the stage after Draft, added to a ZIP after
|
||||
consideration, feedback, and rough consensus from the community.
|
||||
The Proposed status is approved by consensus among the current ZIP
|
||||
Editors.
|
||||
The Proposed status MUST be approved by consensus among the current
|
||||
ZIP Editors.
|
||||
|
||||
* Rejected: The status when progress hasn't been made on the ZIP in one
|
||||
year. Can revert back to Draft/Proposed if the Owner resumes work
|
||||
or resolves issues preventing consensus. The Rejected status is
|
||||
approved by consensus among the current ZIP Editors.
|
||||
* Rejected: If no progress on a Draft or Proposed ZIP has been made for
|
||||
one year, the ZIP Editors SHOULD move it to Rejected status. It can revert
|
||||
back to Draft/Proposed if the Owner resumes work or resolves issues
|
||||
preventing consensus. The Rejected status MUST be approved by
|
||||
consensus among the current ZIP Editors.
|
||||
|
||||
* Implemented: When a Consensus or Standards ZIP has a working
|
||||
reference implementation but before activation on the Zcash network.
|
||||
|
@ -608,14 +609,14 @@ Specification
|
|||
Owners of a ZIP may decide on their own to change the status between
|
||||
Draft or Withdrawn.
|
||||
|
||||
A ZIP may only change status from Draft (or Rejected) to Proposed, when
|
||||
the Owner deems it is complete and there is rough consensus on the
|
||||
A ZIP SHOULD only change status from Draft (or Rejected) to Proposed,
|
||||
when the Owner deems it is complete and there is rough consensus on the
|
||||
forums, validated by consensus among the current ZIP Editors. If it's a
|
||||
Consensus ZIP, a Deployment section MUST be present in order for the ZIP
|
||||
to change status to Proposed. Typically, although not necessarily, this
|
||||
will specify a network upgrade in which the consensus change is to activate.
|
||||
|
||||
A Standards ZIP may only change status from Proposed to Implemented once
|
||||
A Standards ZIP SHOULD only change status from Proposed to Implemented once
|
||||
the Owners provide an associated reference implementation, typically in
|
||||
the period after the network upgrade's specification freeze but before
|
||||
the implementation audit. If the Owners miss this deadline, the Editors
|
||||
|
|
Loading…
Reference in New Issue