83 lines
1.4 KiB
Markdown
83 lines
1.4 KiB
Markdown
|
|
Wide band oxygen.
|
|
|
|
We have cj125 integration
|
|
|
|
TODO: document it better
|
|
|
|
|
|
# cj125 troubleshooting
|
|
|
|
|
|
|
|
We have a few rusEFI console commands relevant for cj125
|
|
|
|
``cj125_info``
|
|
|
|
``cj125_restart``
|
|
|
|
``cj125_calibrate``
|
|
|
|
|
|
|
|
![x](overview/wbo/cj125_heating_4_9.png)
|
|
|
|
|
|
AndreiKA says Prometheus works
|
|
|
|
Matthew says 0.3 SOIC-24 boards works
|
|
|
|
Wideband controller based on Bosch CJ125 chip
|
|
|
|
green is vUr, temperature feedback
|
|
|
|
red is duty cycle
|
|
|
|
yellow is vUa, the lambda current measurement
|
|
|
|
white is converted AFR
|
|
|
|
fully operating in <30 seconds
|
|
|
|
in to closed loop in ~18 seconds
|
|
|
|
P=30
|
|
|
|
I=5
|
|
|
|
D=0.3
|
|
|
|
though you could probably use D=0 since the system is already damped so hard
|
|
|
|
50Hz
|
|
|
|
|
|
[Older SOIC-24 board - double sided assembly](https://github.com/rusefi/hw_modular/tree/master/cj125_Module)
|
|
|
|
[Newer LQFP-32 board - single side assembly](https://github.com/rusefi/rusefi/tree/master/hardware/CJ125_board)
|
|
|
|
|
|
IP Pump Current
|
|
|
|
VS/IP=VM=common virtual ground for VS and IP
|
|
|
|
H+ Constant +12v
|
|
|
|
H- Heater control, low-side
|
|
|
|
4.9 pinout courtesy of https://www.wbo2.com/cable/lsuconns.htm
|
|
|
|
![x](FAQ/LSU-4-9-17025hcon.gif)
|
|
|
|
|
|
|
|
![x](FAQ/LSU_42_LSU_49_Plug_Comparsion.jpg)
|
|
|
|
With SOIC-24 rusEFI module W1=W10=0R means LSU 4.2
|
|
|
|
With SOIC-24 rusEFI module W1=W10=Do not populate means LSU 4.9
|
|
|
|
Q: Any troubleshooting hints when things do not work?
|
|
|
|
A: VM wire between CJ125 and sensor is virtual ground, should measure 2.5v when sensor is connected and when sensor is disconnected.
|