ZcashLightClientKit/docs/ci.md

417 B

Continuous Integration

The project is integrated the following CI platforms:

  • Bitrise
    • Builds
  • Travis CI
    • Builds

When a PR is opened

  • check that linting is successful (to be integrated)
  • check that the code builds
  • check that PR tests pass

Manual Deployment

Prerequisites:

  • Write permissions on the repo

Steps:

  • build the project
  • run tests
  • Create a new tag MAJOR.MIDDLE.MINOR{-betaX}